Business Customs and Project Management Tips for Co-Developing with Local Thai Companies

Business Customs and Project Management Tips for Co-Developing with Local Thai Companies

Introduction

Many of the delays and rework that occur in joint development with local Thai companies arise from proceeding on implicit assumptions without accounting for business customs that emphasize relationship-building, hierarchical decision-making, and a reporting culture that preserves face. This article is aimed at personnel at Japanese companies advancing system development with local Thai companies, and explains practical responses through four differences—contracts, decision-making speed, reporting culture, and common misunderstandings—along with implementation steps based on these differences. After reading, you will be able to select concrete measures suited to your own project, such as quantifying acceptance criteria, confirming approval routes in advance, and setting up a mechanism for progress reporting that answers with numbers.

The Japanese-style approach of "understanding without being told" does not account for Thai business culture, which places importance on human relationships, hierarchy, and face. Proceeding on implicit assumptions without addressing this directly leads straight to delays in approval and rework of deliverables.

Why the Japanese Approach Based on Tacit Knowledge Doesn't Work

In Thailand, high-context and group-oriented communication is deeply rooted, and an awareness called "kreng jai (consideration)"—a sense of deference toward others and avoidance of criticism—strongly influences how messages are conveyed. In this culture of consideration, even when staff members sense questions or concerns, they tend to avoid directly raising objections to superiors or business partners, instead substituting ambiguous responses or silence. When the Japanese side proceeds without verbalizing the details of specifications or priorities, expecting that "they will understand without being told," Thai staff members find it difficult to ask for confirmation even when they want to, and as a result, work proceeds while misunderstandings remain unresolved.

In development between Japanese companies, on-site teams implicitly share assumptions and past background not written in design documents, and proceed by omitting repeated confirmation work. This approach presupposes that both sides share the same industry practices and corporate culture—a premise that does not hold in joint development with local Thai companies. If requirements and acceptance criteria are not documented and the project proceeds on the assumption that "it has probably been conveyed," gaps in specifications tend to surface only at the point the deliverable is completed.

Furthermore, since the awareness of preserving face works more strongly toward those in a higher position, a structure tends to emerge in which local staff find it difficult to ask questions of the Japanese side as the client, and interpreting silence as a "sign of understanding" leads to misjudgment. Therefore, instructions and expectations should not rely on verbal explanation alone; they need to be documented as specifications or checklists, and a separate opportunity for confirmation should be established where the other party can easily raise questions. It is also effective to explicitly welcome questions at the start of meetings and to set aside time for individual confirmation.

Specific Situations Where Business Practice Differences Cause Delays and Rework

A typical scenario is one in which important decisions appear to have been agreed upon at the working level, but the actual approval takes place at a higher organizational level, causing the project to stall. The first meeting is often treated by the Thai side as an occasion for relationship-building, and if the Japanese side mistakes it for "a venue for reaching agreement" and treats the meeting minutes as finalized matters, conditions may change at a later approval stage. Even when discussions have been settled with on-site staff, separate confirmation from senior management holding signing authority is required, so if a waiting period for approval is not built into the schedule, delays will occur.

A similar structural problem arises at the time of acceptance inspection. When the quality standards expected by the client are not documented for a deliverable that the development side has reported as "complete," a gap arises between the on-site acceptance standard and the Japanese side's expectations, making rework likely at the acceptance stage. In particular, if acceptance criteria are left as abstract expressions such as "operates without problems," interpretations of what constitutes a pass differ from person to person, and exchanges of re-correction repeat.

Such delays and rework do not stem from a lack of capability on the part of individual staff members, but from the fact that approval routes and acceptance criteria are not shared as documentation. This is also an issue common to Offshore Development in general, and clearly specifying the approval process and acceptance conditions at the contract stage is the starting point for addressing it.

What Characteristics Should Be Noted in Contracts with Thai Local Companies?

What Characteristics Should Be Noted in Contracts with Thai Local Companies?

In development contracts with Thai companies, the starting point is to decide, as contract clauses before signing, three matters: the governing language, the governing law, and the method of dispute resolution. Article 14 of Thailand's Civil and Commercial Code provides that, when the contents of documents prepared in multiple languages including Thai conflict with one another and the parties' intention as to which language should govern is unclear, the Thai-language text shall prevail (the Japanese translation of the provision is based on the provisional translation by JETRO Bangkok Center). The governing law is determined first by the intention of the parties, under Article 13 of the Act on Conflict of Laws (B.E. 2481). In both cases, the conclusion can change depending on how the clause is drafted, so together with the clauses on acceptance criteria and payment terms, the wording should be checked with a local lawyer.

Contract Scope and Change Management Practices

Acceptance criteria and change management procedures must be written into the contract as objectively measurable standards rather than abstract expressions. Section 11 of the Civil and Commercial Code stipulates that in case of doubt, interpretation should favor the party bearing the obligation. If the wording remains something like "there are no quality issues," there remains room for this to be interpreted in favor of the development company bearing the delivery obligation, so it is necessary to specify numerical acceptance criteria, acceptance procedures, and even the length of the inspection period. For example, by defining the inspection period as "notification of acceptance completion or rejection within 10 business days after submission of deliverables" and setting acceptance criteria such as "100% pass rate for normal-path testing of core functions, 90% or higher pass rate for abnormal-path testing," establishing standards with concrete numerical values makes it easier to directly repurpose these for your own company's contracts. Regarding the inspection period as well, if the number of days is not specified, the waiting period for acceptance can extend indefinitely, leading to situations where payment and the start of the next process stall.

How Change Orders are handled is also a matter that should be included within the scope of contract documentation. If, during development, requirement additions or specification changes occur, and matters such as who can request changes, who the approver is, and in what format agreement on additional costs or impact on the schedule will be reached are not determined in advance, work proceeds based solely on verbal agreements at the field level, which later becomes a cause of discrepancies in understanding regarding costs and deadlines. By attaching a change request form format to the contract and establishing a rule that work begins only after both parties' signatures or written confirmation, confusion in which field-led specification changes are treated as work outside the contract can be prevented.

When using both English and Thai versions of a contract concurrently, which version is authoritative must be clearly stated as a governing language clause. The JETRO Bangkok Office's guide, "Points to Note When Japanese Companies Start Business with Thai Companies as Partners," states that as an issue in joint venture contracts, it is generally common to make the English text, which both parties can understand, the authoritative version. However, if there is no language clause and the content of the two versions conflicts, the Thai version's wording will govern under Section 14 of the Civil and Commercial Code, so whether the acceptance criteria and change management clauses have the same figures and deadlines in both versions should be cross-checked before signing. Even if the English version is made authoritative, Thai court proceedings are conducted in Thai, and foreign-language documents may be required by court order to be submitted with a Thai translation (Civil Procedure Code Section 46). According to the same guide, there is no treaty regarding litigation between Japan and Thailand, and judgments from Japanese courts cannot be directly enforced in Thailand. In joint venture contracts, it is said that the larger the scale of the deal, the more common it is to stipulate arbitration in a third country such as Singapore or Hong Kong. Including the method of dispute resolution, please confirm the wording of clauses with a local attorney.

Differences in Payment Terms and Acceptance Criteria

In contracts that tie payment to the completion of acceptance, if the acceptance criteria remain ambiguous, the timing of payment itself becomes uncertain. If acceptance completion is made a condition for invoice issuance, a one-week delay in acceptance will push back the invoice and payment by the same amount. As the ordering party, entering into a contract with an ambiguous definition of acceptance completion can affect the development company's cash flow and also become a cause of delays in starting the next process.

Acceptance criteria should be operated in conjunction with the numerical acceptance standards and inspection period settings discussed under the scope of contract documentation. By not only defining the payment milestone as "after acceptance completion," but also incorporating into the contract who makes the acceptance completion determination and within how many days pass/fail notification will be given, the risk of payment delays can be curtailed in advance. If partial acceptance is permitted, clearly stating which deliverable units payment will be divided by also makes it easier to manage funds in line with project progress.

If the invoice issuance date is used as the starting point for calculating the payment due date, a discrepancy between the acceptance completion date and the invoice issuance date also makes the basis for calculating the payment due date ambiguous. In milestone-based contracts, it is important to individually set the definition of acceptance completion, the notification deadline, and the payment due date for each milestone, avoiding a structure where a delay in acceptance for even a single item causes a chain reaction of delays to the overall payment. Since how payment terms are determined varies by project, in individual contract negotiations, the practical approach is to confirm with local accounting and legal experts and cross-check your own company's funding plan against the acceptance schedule.

How to Respond to the Decision-Making Speed of Thai Local Companies?

How to Respond to the Decision-Making Speed of Thai Local Companies?

Field-level agreement is merely an interim report, and schedules must be structured on the premise of final approval from upper management holding signing authority. Planning without accounting for the approval waiting period can lead to a situation where field-level progress and the contractual delivery deadline diverge.

Dealing with Meetings Without Decision-Makers Present

If the decision-maker does not attend the initial meeting and requirements or conditions are finalized solely through discussions with on-site personnel, cases arise where the decision-maker later introduces changes to conditions or requests additional confirmation, overturning content that was believed to have already been agreed upon. This stems from the fact that upper management holding decision-making authority exists separately, and field-level agreement and final approval operate as separate processes, so judging the certainty of an agreement based solely on the composition of meeting attendees will lead to failure.

As a countermeasure, it is effective to confirm who holds signing authority at the meeting-setting stage, and to request in advance that meetings dealing with important decisions be attended either by the decision-maker in person or by a representative who has received clear delegation from the decision-maker. If the decision-maker cannot attend, the content decided at that meeting should be treated as "tentative," with the minutes clearly noting that the item is pending approval, and operations should be set up so that the next process does not begin until confirmation and approval—via signature or email—is obtained from the decision-maker.

Even when a delegated representative attends, confirming at the outset of the meeting whether the scope of delegation extends to changes in budget or deadlines, or is limited to confirming technical requirements, can prevent later changes to conditions. The schedule must incorporate in advance the period from field-level agreement to the decision-maker's final approval. If a plan is made without accounting for the approval waiting period, even though things may appear to be progressing smoothly at the field level, a discrepancy will arise with the contractual delivery deadline or milestones.

How to Confirm the Approval Process in Advance

Obtaining an organizational chart and a list of signing authority holders from the Thai local company before the contract signing stage can reduce the risk of tentative decisions being made at meetings the decision-maker does not attend. The three items that should be confirmed are: who holds final approval authority, up to which level in the hierarchy technical specification documents and acceptance reports are circulated, and how much time approval typically takes. Since accurate answers are difficult to obtain through verbal inquiry alone, a written interview sheet should be prepared before the kickoff, with responses obtained through the counterpart company's designated point of contact.

Item to ConfirmMethod of ConfirmationInformation Obtained
Organizational chart / reporting lineRequest in writing before contractWho reports to whom
Signing authority holderConfirm via the company's registration certificate issued by the Department of Business Development, Ministry of CommerceWhether a single person can sign, whether the company seal is required
Standard approval hierarchyAsk via interview sheetThe path from field-level agreement to approval
Expected document formatCheck templates of past contracts/reportsFormat of technical specification documents and acceptance reports

Where things differ from Japan in confirming signing authority is in the treatment of the representative director (daihyō torishimariyaku). In Japan, if someone is registered as a representative director, they are recognized as having authority to represent the company; however, according to the aforementioned JETRO guide, Thailand has no equivalent provision, and instead the mechanism is such that which director holds signing authority binding the company, and whether the company seal is required, is registered with the Ministry of Commerce. Even if someone's title is President, there are cases where that person alone cannot sign, so signatories on contracts and acceptance reports should be cross-checked against the registration details.

By attaching the content of this table as an appendix to the contract and having both parties agree in advance on the approval hierarchy and required format, the effort of checking for the decision-maker's presence at every meeting is reduced, preventing situations where the approval route must be re-investigated mid-project.

When signing authority holders span multiple hierarchical levels, the boundary line—up to what amount or scope falls within field-level authority, and from what point upper management approval is required—should also be confirmed together. If this boundary remains ambiguous, content that a field representative communicated as "approved" may in fact not have gone through confirmation by upper management, leading to changes in conditions at a later process stage. The confirmed content should be reflected in the kickoff materials, ensuring all project stakeholders share the same understanding of the approval route.

What Are the Differences in Reporting and Communication Culture with Thai Local Companies?

What Are the Differences in Reporting and Communication Culture with Thai Local Companies?

Even when progress is reported as "no problems," it is necessary to receive such reports on the premise that problems may actually be occurring. In environments where consideration for preserving face is at work, verbal affirmative responses and the actual state of work may proceed without matching, making it essential to adopt an operational approach that combines this with written confirmation.

Why Progress Reports Don't Come In

Even when problems occur, the fact that reports do not come up spontaneously from those in charge is related to the culture of preserving face and avoiding criticism. In Thai workplaces, directly conveying progress delays or technical issues to a superior or client tends to be perceived as an act that lowers the evaluation of oneself or one's team, which gives rise to a tendency to avoid reporting or to rephrase problems in ways that make them appear smaller. Because this tendency manifests in ways that are difficult for Japanese-side personnel to notice, a situation can arise where only the report "progress is going well" is received, and the team proceeds to the next process without noticing the actual delay.

This structure is not a matter of the integrity of individual staff members, but stems from the fact that reporting a problem itself is perceived as affecting one's evaluation and relationships within the organization. Therefore, if progress checks are limited to asking "Are there any problems?", in an atmosphere where it is difficult to push back, the only answer obtained will be "No." If the way questions are phrased is changed to a format that requires answering with numbers or specific facts, such as "What percentage is currently complete?" or "How many errors occurred in testing?", the reporter does not have to make a negative judgment on their own, making it easier to elicit information closer to the actual situation.

Setting progress meetings at shorter intervals and checking in while changes are still small is also a way to avoid situations where problems only surface after they have grown large. In addition, avoiding a questioning style that singles out and presses individual staff members, and instead checking the situation at the team or task level, makes it easier to share the actual state of affairs while reducing concerns about a drop in individual evaluation. Linking reported content not just to statements made in meetings but to an operation that records numbers and completed items leads to the documentation practices discussed next.

Ways to Bridge the Gap Between Verbal Agreements and Documentation

Even when a verbal response of "Yes, understood" is obtained, this may be an expression of acknowledgment or intent to consider, and may not mean technical agreement. For important matters, verbal exchanges should not be treated as the final form; an operational approach is needed in which, after the meeting ends, decided matters are put into a document, and the matter is not treated as agreed until explicit confirmation is obtained via the other party's signature or email.

In practice, it is effective to create the meeting minutes in real time during the meeting itself while sharing the screen, separately recording decided matters, pending matters, and items to be confirmed by the next meeting. Content left as pending matters should be treated as unconfirmed until reconfirmed at a later meeting, and should not be reflected in specifications or design documents. When documenting, including how to handle language, arrangements should be made in line with the points discussed in "Characteristics to Pin Down in Contracts with Local Thai Companies."

During the first several weeks of introduction, a period of dual confirmation should be established in which verbal confirmation and written confirmation proceed in parallel, to grasp at which stage discrepancies tend to occur. Recording how much time the other party takes to sign or respond to documents each time confirmation is sought provides material for judging whether the person in charge is unaccustomed to written confirmation. If the response to written confirmation is slow, the means of confirmation should be switched, such as prioritizing in-person signatures over email, and the frequency and format of subsequent reporting and approval flows should be adjusted according to the results.

What Kinds of Misunderstandings Commonly Occur in Joint Development?

What Kinds of Misunderstandings Commonly Occur in Joint Development?

Agreement expressed in words or attitude is different from actual technical agreement. When a superficial interpretation of responses overlaps with assumptions about local quality standards, problems can proceed unnoticed right up until the moment just before acceptance inspection.

Situations Where "Yes" Doesn't Mean Agreement

A "yes" response from local staff does not necessarily mean only that they understood the requirements and agreed to carry them out. It is sometimes used as a signal of listening without interrupting the speaker, as an expression of respect toward a superior or client, or with a nuance of reservation close to "I'll consider it" — and it may be uttered with a meaning separate from technical agreement. If, during a meeting where specifications are explained, the other party nods and says "yes," and this is simply recorded as "agreement has been reached," it can become the cause of deliverables emerging later during implementation or acceptance inspection that differ from what was explained.

A Japanese manufacturing company that entered into a technology licensing agreement with a Thai company, in the interview for the aforementioned JETRO guide mentioned earlier, recalled that even when the contracting partner said "it's fine," it often was not actually fine, and recommended allowing extra margin in the schedule.

To prevent this kind of misunderstanding, a verbal "yes" should not be treated as confirmed agreement; instead, a confirmation step should be built into the meeting in which the other party is asked to restate the specific content in their own words. Rather than asking "Have you agreed to the current specifications?", switching to a question that has the other party explain their understanding of the implementation, such as "Please explain, in your own words, what happens when this button on this screen is pressed," will reveal any parts that are not understood or are misunderstood in the response.

If the other party struggles to explain in English or Japanese, rather than forcing language unification, switching to a method of pointing at screen mockups or diagrams to confirm allows one to distinguish misunderstandings caused by language barriers from gaps in technical understanding. When a response to a question ends only in abstract words, further explanation involving specific numbers or operational procedures should be requested, so that ambiguity is not allowed to pass unaddressed.

By treating the "yes" obtained in a meeting as a provisional agreement to be recorded in the minutes, and reflecting it in the specifications only after final confirmation in writing at a later date, discrepancies between verbal agreement and actual technical understanding can be discovered before the specifications are finalized.

Misunderstandings from Differing Perceptions of Quality Standards

When a report stating "operation has been confirmed" is received, the quality level that the ordering side and the development side have in mind may not match. The quality that the Japanese side envisions often includes handling of exceptional inputs and edge cases, as well as fine details of screen display, whereas the scope that local staff understand from the phrase "operates without problems" may be limited to the main operational flow working correctly. This gap is not a difference in capability, but rather a range of interpretation that arises because acceptance criteria are not quantified in the contract or specification documents.

To prevent misunderstanding, before the acceptance inspection stage, clearly separate and specify "normal-path operations working correctly" and "error handling functioning for abnormal inputs," and prepare a concrete list of which test cases serve as pass conditions. For example, by writing out items to be verified as individual operations such as "behavior when full-width characters are entered into an input field" or "retransmission processing upon network disconnection," local staff are not left to narrow the acceptance criteria based on their own judgment.

By dividing test cases by functional unit and assigning a priority of "required" or "recommended" to each screen, both sides can share a criterion for how far abnormal-path verification should go within limited work hours. If all items are treated equally without distinguishing priority, time may end up being spent fixing low-importance display glitches, while verification of processes with major business impact gets postponed.

By linking this list to the scope described in the acceptance conditions and determining in advance who will judge pass/fail for each test item, it becomes easier to avoid a situation where a gap in understanding is discovered only at the acceptance inspection stage. Rather than leaving judgment solely to the local side, having Japanese staff also be present to confirm the main items allows discrepancies in criteria to be resolved on the spot.

What Are the Implementation Steps to Keep Joint Development with Thai Local Companies on Schedule?

What Are the Implementation Steps to Keep Joint Development with Thai Local Companies on Schedule?

Even if each individual issue—contracts, approvals, and reporting—is addressed separately, the same discrepancies will recur repeatedly during the course of a project unless a shared understanding is established all at once at the kickoff. Alignment at the introduction stage and establishing operational rules support progress according to plan.

Shared Understanding to Establish at Kickoff

By agreeing in writing, at the kickoff meeting, on the five items of objective, deliverables, approval route, reporting frequency, and payment terms, the effort of reconfirming each item individually in later processes is reduced. The objective should be expressed in a single sentence defining "what must be achieved to be considered a success," so that all project stakeholders can explain it using the same words. Deliverables should be defined in a way that includes quantified acceptance criteria and prioritized test cases, avoiding a situation where a gap in understanding is discovered only at the acceptance inspection stage.

For the approval route, attach to the kickoff materials a document listing those with signing authority and the standard approval hierarchy, so that all stakeholders can confirm, using the same diagram, whose approval must be obtained before proceeding to the next process. For reporting frequency, fix in advance the interval and format for progress checks, and agree to adopt a question format that is answered with numbers, such as "what percentage is currently complete."

For payment terms, clearly specify the definition of acceptance completion, the notification deadline, and the payment due date for each milestone, and decide at this point whether partial acceptance will be permitted.

If even one of these five items is left as a verbal confirmation to be carried over, later processes will require re-confirming the approval route or re-adjusting the reporting format, consuming the time of both sides' staff each time. By creating meeting minutes at the kickoff and keeping them as a list recording the person in charge and the confirmation date for each item, it becomes possible to avoid having to re-argue later over whether an agreement was actually reached. If both the Japanese and Thai sides keep the same version of the document and update and share the version number whenever changes are made, discrepancies in understanding can be detected early.

Steps to Put Reporting and Approval Rules into Practice

The reporting frequency and approval route agreed upon at the kickoff will not take hold in actual operation simply by being recorded in a document. To make them function in real projects, they should be established in the following order.

  1. From the first progress check onward, actually use a question format answered with numbers (completion percentage, number of test cases), and if a response remains an abstract expression, ask on the spot for a specific figure.
  2. Compile provisional decisions made in meetings into minutes, send them to the other party within 24 hours, and set a deadline for confirmation via signature or email reply.
  3. For the first 4 to 6 weeks, run verbal confirmation and written confirmation in parallel, and record which staff members take time to respond to written confirmations.
  4. For staff members who are slow to respond, switch to prioritizing in-person confirmation over email, and reconsider their reporting frequency going forward.
  5. For any instance where an unexpected delay occurs in the approval route, compile the causes into a list, distinguishing whether the signing authority's confirmation was missed or whether the report itself was delayed.

When running this cycle, operate on the premise that rules, once decided, should not be fixed permanently, but reviewed according to the scale of the project and changes in personnel. For example, while weekly numerical reporting may be sufficient for a small-scale modification project, a large-scale project involving multiple teams may require switching to daily sharing of completed item counts. By also grasping in advance periods when an approver will be absent due to business trips or vacation, and designating a proxy approver beforehand, stoppages caused by waiting for approval can be avoided. Keeping a record in the minutes of changes to the operational rules themselves, so that all stakeholders can trace the background of each change, is key to bringing rules that would otherwise remain mere formalities closer to actual practice.

Frequently Asked Questions

Frequently Asked Questions

Regarding delays in contract confirmation, progress reporting, and decision-making, practical responses are addressed in three separate points.

Q1: What Should Be Confirmed in Contracts with Thai Local Companies?

The four points that should be checked first are: quantification of acceptance criteria, the governing language and applicable law of the official text, change management procedures, and payment milestones. For acceptance conditions, avoid abstract expressions such as "operates normally," and document in writing even the pass/fail judge and the number of days for the inspection period. When using both English and Thai versions, specify in a clause which version is to be treated as the official text. If there is no such provision and the content differs between versions, Section 14 of the Civil and Commercial Code dictates that the Thai version will govern, so you should have a local lawyer confirm whether the amount, delivery date, and acceptance conditions match across both versions. By also predetermining the format for change requests, the approver, and the division units in cases where partial acceptance is permitted, it becomes easier to avoid condition changes or payment delays in later processes.

Q2: How Should You Respond When Progress Reports Are Delayed?

Change progress-check questions into a format that can be answered with numbers, such as "percentage complete" or "number of tests," and ask them on a team-by-team basis. If answers remain abstract, shorten the meeting frequency, send the minutes within 24 hours, and set a reply deadline. For personnel showing no improvement, switch to an operation that prioritizes in-person confirmation.

Q3: How Can You Prevent Project Delays When Decision-Making Is Slow?

Since the slowness of decision-making cannot be changed, the basic response is to build the approval waiting period into the schedule as a buffer. Delays can be minimized by hearing in advance how many days approval typically takes and by designating a proxy approver as well. For specific operational methods, refer to the content of the previous section.

Conclusion

Conclusion

The judgment criteria for proceeding with joint development with a local Thai company as planned can be summarized into four differences—contracts, decision-making speed, reporting culture, and common misunderstandings—along with the implementation steps for putting these into operational practice. For contracts, the premise is to secure quantification of acceptance criteria, clauses on the governing language and applicable law of the official text, and the format for change management. To address decision-making speed, meetings not attended by the decision-maker must be treated as provisional decisions, and it is necessary to confirm in advance who holds signing authority and the approval hierarchy. For reporting and communication, on the premise that reports of "no problems," made out of consideration for saving face, may diverge from reality, combine a question format that elicits numerical answers with written confirmation.

As common misunderstandings in joint development, not immediately assuming that a "yes" response constitutes technical agreement, and concretizing quality standards through test cases that separate normal and abnormal scenarios, also serve as judgment criteria for avoiding rework just before acceptance. The procedure of agreeing on these as documents at kickoff and putting the reporting and approval rules into operation over several weeks supports progress as planned. First, in your own company's projects, start with a hearing sheet for the approval hierarchy and a list for quantifying acceptance criteria.

This article is intended for general informational purposes. For individual contract terms or legal judgments, please consult local lawyers, accountants, or other professionals.

References

  1. www.finearts.go.th/storage/contents/file/XDywyEZdwrn71nO1Y74xyuvc7Yk3PnF4M4KTdj…Accessed November 18, 2026
  2. www.sbpac.go.th/home/wp-content/uploads/2024/02/ป.พ.พ.pdfAccessed November 18, 2026
  3. www.inpit.go.jp/content/100874700.pdfAccessed November 18, 2026
  4. www.moc.go.th/pdf/web/viewer.htmlAccessed November 18, 2026
  5. www.pmda.go.jp/files/000279009.pdfAccessed November 18, 2026
  6. www.jica.go.jp/about/announce/buppin/detail/__icsFiles/afieldfile/2024/02/28/1_…Accessed November 18, 2026
  7. laws.anamai.moph.go.th/web-upload/14xcc0f5638f262f918558abe1085de08b4/m_magazin…Accessed November 18, 2026
  8. www.jetro.go.jp/ext_images/world/asia/th/business/regulations/pdf/corporate_018…Accessed November 18, 2026
  9. www.jetro.go.jp/ext_images/_Reports/01/6158c5a28efdb378/20150077-1.pdfAccessed November 18, 2026

Author & Supervisor

Yusuke Ishihara

Yusuke Ishihara

Started programming at age 13 with MSX. After graduating from Musashi University, worked on large-scale system development including airline core systems and Japan's first Windows server hosting/VPS infrastructure. Co-founded Site Engine Inc. in 2008. Founded Unimon Inc. in 2010 and Enison Inc. in 2025, leading development of business systems, NLP, and platform solutions. Currently focuses on product development and AI/DX initiatives leveraging generative AI and large language models (LLMs).