How to Build a Roadmap for AI Adoption at Your Thailand Office with Headquarters Approval

Introduction
AI adoption at Thailand-based operations can be turned into a roadmap with fewer rejections by designing the flow from on-site issue identification through PoC, approval, and full-scale deployment so that it meshes with the head office's decision-making process. This article is aimed at DX promotion staff planning AI adoption at Thailand-based operations, and concretely shows how to proceed from confirming prerequisites through Steps 1-4 (prioritizing issues, preparing proposal materials, designing the approval process, and making the go-live decision), along with how to avoid common mistakes. After reading, you will be able to organize decision-making authorities and approval stages to fit your own project, and build proposal materials and a schedule that can be submitted to the head office.
If you proceed with planning without first clarifying where decision-making authority lies and without assembling the materials needed to present issues and cost-effectiveness, you will encounter rejections at the approval stage. Establishing a governance structure and risk management framework first, as the top-level requirement for AI adoption, is also required under ISO/IEC 42001.
Understanding the Head Office Approval Flow and Decision-Making Authority in Advance
Before designing the approval process, it is essential to document who has the authority to approve what, at which stage. In the head office organizations of Japanese companies, the decision-making lines for IT investment, handling of personal data, and budget execution often span different departments. If the approver assumed by the Thailand-based operation does not match the actual decision-making authority, proceeding with the proposal as-is will result in it being sent back to a different department after submission.
There are four items that should be confirmed:
| Item to Confirm | Specific Question to Ask |
|---|---|
| Approver's position | Who makes the decision at each stage: PoC initiation, interim reporting, and go-live |
| Required submission materials | Which of the following are mandatory: internal approval request (ringisho), risk assessment report, budget application |
| Decision criteria | What the decision is based on, such as KPI achievement rate or payback period |
| Submission deadline and frequency | Cut-off dates for the approval cycle, timing of regular meetings |
ISO/IEC 42001 requires that "top management's responsibilities, AI policy, and the assignment of roles, responsibilities, and authorities" be clarified as part of the AI management system (AIMS). Documenting this between the head office and the Thailand-based operation reduces the effort of redoing proposal documents. In particular, for initiatives that handle personal data, a separate approval line for PDPA (Thailand's Personal Data Protection Act) compliance may be required, so confirmation with the compliance department, in addition to the information systems department, should also be carried out.
Furthermore, for projects where decision-making authority spans multiple departments, it is also necessary to align in advance on the order in which approvals from each department should be obtained. Getting the order wrong can result in an approval obtained later contradicting an earlier approval's content, requiring resubmission to both departments. It is advisable to complete this confirmation work before starting to prepare the proposal materials.
Issues and Cost-Benefit Materials to Prepare at the Thailand Site
By documenting seven items—problem definition, current baseline, success criteria, required data, cost estimate, expected benefits, and key risks—before bringing the proposal to the head office, you can create a situation where decision-makers can make a judgment without needing to ask additional questions. These items are essential elements for accurately communicating the purpose and scope of the PoC to the head office and for assembling the materials needed for an approval decision.
The current baseline refers to numerical representations of current operations, such as processing volume, processing time, and error rate. Without these figures, it becomes impossible to show "how much improvement was achieved" after the PoC, leaving the head office without the material needed to make an investment decision. Success criteria should include at least one quantitative KPI, with agreement reached numerically down to, for example, "what percentage the misjudgment rate must be kept to for the project to be considered a success," rather than a vague statement like "accuracy improved."
For required data, specify which business data will be used, who will have access rights, and whether processing will take place within Thailand. If personal data is included, the handling conditions based on the PDPA (Thailand's Personal Data Protection Act) should also be included in the materials, and whether confirmation from the compliance department is needed should be determined at this stage.
Initial costs and expected benefits can be rough estimates expressed in terms such as reduced man-hours or decreased misjudgment rates; a detailed ROI calculation should be performed at the proposal-preparation stage. For the key risks item, rather than merely listing conceivable problems such as personal data leaks or malfunctions, it is helpful to also write out, together with these, the decision criteria for how much impact on operations is tolerable if such a problem occurs and under what conditions the PoC would be halted—this allows the head office to grasp the scale of the risk without requiring additional confirmation work.
Step 1: How to Identify and Prioritize Field Issues?

Identifying on-site issues proceeds in two stages: grasping the actual state of issues through interviews with business departments, then narrowing down PoC candidates based on four axes—strategic alignment, technical feasibility, risk, and economic impact. If the precision of the interviews and the criteria for prioritization judgment are misaligned, the narrowing-down at this stage will go wrong.
How to Conduct Issue Hearings with Business Departments
When designing the hearing, you need to present four pieces of information to the business department before starting the questions: the business impact of the problem (which KPI is affected and by how much), the current workflow, the location of the required data, and at least one quantitative KPI as a success criterion. Sharing these in advance makes it easier for the business department to raise issues that can be measured numerically, rather than abstract complaints.
During the actual hearing, information should be gathered in the following order:
- At which step in the current workflow the problem occurs (identifying the process name and the person in charge)
- How frequently the problem occurs, and the processing time per case and whether rework is involved
- The criteria for judging that the problem has been resolved (e.g., keeping the misjudgment rate below a certain percentage)
- The type of data used for judgment and processing, and who has access rights to that data
Example: In response to a vague complaint such as "inspection work is slow," you should re-ask to quantify it, down to "how many items are processed per day by visual inspection, how many minutes each takes, and how many false detections occur."
At the Thailand site, situations arise where on-site staff explain operations in Thai, while reports are submitted to headquarters in Japanese. Deciding on the language to be used and the recording method at the hearing stage, and preparing a correspondence table between numerical data and business terminology, can reduce the effort of re-asking questions later. Securing past judgment cases at this stage as an evaluation set for validation purposes allows them to be used directly as evaluation data when designing the PoC (proof of concept). At the end of the hearing, reaching agreement on who is responsible for the issue and who will serve as the evaluator during the PoC will reduce coordination work in later stages.
Priority Criteria for Narrowing Down PoC Candidates
Scoring candidates on four axes—strategic alignment, technical feasibility, risk, and economic impact at scale—narrows down which of the issues raised in the hearing should be included in the proposal to headquarters. These four axes form a prioritization framework commonly used even in government agency PoC guidance.
Strategic alignment checks whether the issue aligns with headquarters' investment policy and the site's mid-term plan. Even if the issue is a pain point on the ground, issues in business areas that headquarters does not prioritize will incur greater explanation costs when getting the proposal approved.
Technical feasibility is judged based on the quality and quantity of data secured during the issue hearing, and whether access rights exist. For issues lacking sufficient past cases to serve as an evaluation set, you should either deprioritize them at this stage or separate data preparation out as a preceding task.
For the risk axis, check whether personal data is involved and how large the business impact would be if a misjudgment occurs. Candidates involving data subject to the PDPA (Thailand's Personal Data Protection Act) require additional confirmation from the compliance department, so even if priority is high, note that the lead time before starting will be longer.
Economic impact is evaluated based on the scale of benefit if rolled out across the entire site. Issues that can be expanded to multiple sites or multiple processes are more likely to gain headquarters' investment approval than issues where benefits are limited to a single process. Score each of the four axes on a roughly three-point scale, narrow down to the one or two candidates with the highest total scores, and proceed to preparing the next proposal document.
Step 2: How to Create Proposal Materials for Head Office?

At the stage of translating the one or two narrowed-down candidates into a proposal for headquarters, it is necessary—based on the current baseline—to integrate the two elements of investment return and risk assessment into a single document, structured so that the decision-maker can judge Go/No-Go without needing to ask additional questions.
How to Choose Indicators to Show AI ROI
By using the three financial indicators of NPV (net present value), payback period, and ROI (return on investment) appropriately for different purposes, you can create documents that align with headquarters' capital decision criteria. A document that presents only on-site KPIs may explain operational improvements, but since it is written in a different "language" than headquarters' investment decision criteria, it can lead to requests for additional financial documentation and delayed approval.
NPV is an indicator that converts the future benefits estimated in the PoC into present value and compares them with the initial investment amount. For projects anticipating rollout to multiple sites, presenting an NPV that accounts for cumulative benefits after rollout—not just the single-year labor-hour reduction amount—makes it easier to align with headquarters' investment criteria.
Payback period is calculated by dividing the initial investment amount by the annual benefit amount, showing the time required to recoup the investment.
Calculation example: If the initial investment is 1,000,000 baht and the estimated annual benefit (converted from labor-hour reduction into personnel cost) is 400,000 baht, the payback period is 100 ÷ 40 = 2.5 years.
ROI is the ratio of benefit amount divided by investment amount, used for simple comparisons of investment effectiveness over a short period. Since which of these three indicators headquarters prioritizes varies by organization, before starting to prepare the proposal document, you need to confirm the decision criteria with the approving authority and decide which indicator will serve as the main focus. The figures themselves should be calculated from each site's current baseline and estimated costs, on the premise that figures from other sites are not simply reused. The calculation method for AI ROI (AI Return on Investment) can also be checked, along with industry-specific examples, in Thailand Companies' AI Investment Decision Guide — Implementation Priority Seen Through Industry-Specific ROI Comparison.
Summarizing Risks and Countermeasures from the Head Office's Perspective
Simply listing anticipated risks such as personal data leaks or malfunctions does not allow headquarters decision-makers to judge their magnitude. For each risk, you need to organize three points—"degree of business impact," "countermeasures," and "suspension conditions"—into a single table, and clarify at the proposal stage the line between acceptable and unacceptable risk.
| Risk Item | Impact Level | Countermeasures | Suspension Condition |
|---|---|---|---|
| Mishandling of personal data | High | Restrict access rights, confirm PDPA (Thailand Personal Data Protection Act) compliance | Immediate suspension upon detection of a leak |
| Business disruption due to misjudgment | Medium | Combine with human double-checking | Misjudgment rate exceeds the agreed standard |
| Insufficient data quality | Medium | Pre-validation of the evaluation set | Redesign if accuracy falls below the target value |
Showing suspension conditions numerically allows the PoC to be stopped, if a problem occurs during execution, based on prior agreement rather than on-the-spot judgment by on-site staff. This serves as material for headquarters to confirm "whether there is a mechanism to stop a runaway situation," and keeping it in a form that can be transcribed not only into the risk assessment document but also into the approval request document reduces back-and-forth during the approval stage.
The granularity of the risk assessment should also be mindful of headquarters' perspective. Standardize impact levels into three tiers—"high, medium, low"—and attach a footnote to the table with guidelines for judgment (such as business downtime or the number of affected data records when an incident occurs), so that evaluators at different sites do not score using different standards; this also makes it easier for headquarters to compare proposals when they come in from multiple sites. The risk management framework should also be aligned with the procedures for cross-border transfer of personal data under the PDPA (Thailand Personal Data Protection Act), and if transfers requiring notification or approval are included, the progress of those procedures should also be recorded in the countermeasures column.
Step 3: How to Design the Approval Process?

Even if the proposal materials are ready, if it has not been decided at which stage the approvers will review what and make their decisions, the materials will remain in limbo within headquarters. Agreeing on the approval flow and schedule in advance can prevent back-and-forth exchanges and reactive explanations after the PoC begins.
Aligning the Decision-Making Flow Between the Thailand Site and Head Office
Work begins by laying out, in a single table, the approver names assumed by the Thailand site and the actual approver names stated in headquarters' approval regulations, and checking whether the two match. The job titles confirmed at the stage of grasping headquarters' approval flow and decision-making authority in advance are now mapped onto the ringi (approval request) document template, to verify more concretely whether the submitting departments match on paper.
Discrepancies are most likely to surface in cases where the approver for the start of the PoC and the approver for the go-live decision belong to different departments. The Thailand site may assume it can proceed with approval from the Information Systems department, while at headquarters, budget execution authority may belong to a separate Finance department, meaning simultaneous submission to both departments may already be required at the PoC stage. This discrepancy can be resolved by having the Thailand-side staff coordinate directly with the relevant department staff at headquarters before submitting the proposal materials.
During this coordination, for each of the three stages—PoC start, interim report, and go-live—the approver's job title, the type of documents to be submitted, and the decision criteria should be written out in a table, and a record should be kept showing that staff from both sites agreed on the content via email or meeting. This record becomes the basis for the approval schedule discussed later.
Another point to confirm is whether the content agreed upon by the business department head within the Thailand site matches the wording of the ringi document submitted to headquarters. If the outcomes expected by the business department diverge from the explanation given to headquarters, the agreement with the field will break down after approval, causing rework during the PoC execution stage. Adding a step at the end of the coordination process—having the business department head review the final wording before the ringi document is submitted—can prevent discrepancies from arising after approval.
Schedule and Reporting Timing Until Approval
For each of the three stages—PoC start, interim report, and go-live—it is necessary to map out in advance, on a calendar, the timing of approvals and the content of reports. By linking the approvers and submission documents confirmed during the approval flow coordination to specific dates, the effort of inquiring about deadlines each time something is submitted can be avoided.
Headquarters' ringi cycle may have fixed monthly regular meetings and cutoff dates. Rather than first deciding the Thailand site's PoC schedule and then fitting it into headquarters' meeting schedule, it is easier to avoid delays caused by waiting for approval if the Thailand site's work schedule is built by working backward from headquarters' regular cycle as the starting point.
Reporting timing should be fixed at three points: prior approval before the PoC begins, an interim report during PoC execution, and a Go/No-Go decision after completion. In the interim report, not only progress but also the status of major risks that have arisen should be shared together; sharing concerns with headquarters before completion makes it less likely that new questions will arise at the final decision stage.
Each report should be prepared based on a table listing the types of documents to submit and the approvers, so that the process can proceed the same way even if the person in charge changes. When meetings are held only about once a month, missing one meeting delays the next approval by a full cycle, so submission deadlines for materials should be set not right before the meeting date but several days in advance, allowing time for content review. To prevent reporting from being missed, the planned submission dates for each of the three stages should all be finalized together at the start of the project.
Step 4: How to Proceed from PoC to Full Deployment?

A PoC is a verification to confirm technical feasibility, and go-live is judged by separate criteria. Only when all four of the following are in place—achievement of KPIs, securing of operating costs and funding, implementation status of risk countermeasures, and governance approval via AIMS—can headquarters be in a position to make a Go decision.
PoC Evaluation Criteria and Interim Reporting to Head Office
The PoC evaluation criteria should first fix six items—improvement rate of business KPIs, model accuracy and recall, processing time, estimated cost reduction, classification and severity of malfunctions, and presence or absence of data leaks—and measure them at each interim report in line with the schedule leading up to approval. Keeping the same metrics comparable at every report avoids having to redo evaluations.
Evaluation results should not simply list numbers; the content of the test set used and the evaluation procedure should be described together, so that headquarters staff can reproduce the results with a different evaluator. For example, when measuring the misjudgment rate, showing how many misjudgments occurred out of how many test data items, and further breaking down the misjudgments (whether missed detections or false detections are more common), allows headquarters to judge on the spot whether the predefined suspension criteria have been triggered.
In the interim report, not only the areas of good progress but also, if there are indicators that have not reached their target values, the reasons for this and whether there is a prospect of resolving them before go-live should be shared together. If there are indicators that have not met their targets, distinguishing in writing whether the cause lies in the volume of the evaluation set or in issues with the model itself makes it easier to agree with headquarters on the next course of action. Using the interim report not merely as a one-time checkpoint, but as an opportunity to accumulate material for the Go/No-Go decision ahead of time, makes it less likely that new questions will arise at the go-live decision stage.
Decision-Making Flow for Full Deployment
A Go decision for production deployment can be issued once all four of the following are in place: achievement of quantitative KPIs, completion of risk mitigation measure implementation, confirmation of operational costs and funding, and governance approval by AIMS (AI Management System). Issuing a Go decision when even one of these is missing leads to rework or operational suspension downstream, so it is a prerequisite to clearly indicate which of the four points remains unmet before seeking a decision.
Achievement of quantitative KPIs is judged by whether the six indicators fixed at the PoC evaluation criteria stage and in the interim report to headquarters meet the success criteria agreed upon at the stage of preparing the issues and cost-benefit materials expected from the Thailand site. Completion of risk mitigation measure implementation confirms whether the countermeasures defined at the stage of summarizing risks and countermeasures from a headquarters perspective are functioning as an actual operating mechanism, not merely as a design on paper.
For confirmation of operational costs and funding, the investment return estimate made at the PoC stage is updated to a figure that includes ongoing operational costs (maintenance, monitoring, staffing) for full production operation, and it is checked whether this has been incorporated into headquarters' budget cycle. Governance approval by AIMS refers to the record of the approver—designated at the stage of aligning the decision-making flow between the Thailand site and headquarters—having signed off based on the final version of the materials.
If, of the four points, the KPIs have been achieved but funding has not yet been secured, a practical approach is to resubmit as a "conditional hold" rather than a No-Go, attaching the expected timing for securing funds.
What Are Common Pitfalls?

Cases where headquarters approval stalls share a common pattern. In most cases, the cause is not the completeness of the materials, but a mismatch in the timing of communication and the type of judgment criteria that the field and headquarters are each looking at.
Delayed Approval Due to Late Communication with Head Office
An approach of running the PoC (Proof of Concept) first and reporting to headquarters afterward is a typical cause of approval delays. Government agency PoC guidance requires, as a precondition, that approval be obtained from the person in charge before the PoC begins, and that success criteria and discontinuation criteria be agreed upon in advance. If this step is postponed, the Thailand site may consider the verification to be "proceeding smoothly," while headquarters treats it as "an initiative that proceeded without authorization," meaning the process has to start over from re-explanation rather than approval.
A common failure pattern is skipping the step of aligning the decision-making flow between the Thailand site and headquarters, and proceeding with data collection and tool selection for the PoC based solely on momentum at the field level. If the approver specified in headquarters' decision-making regulations differs from the approver the Thailand site had assumed, the materials already submitted cannot be used as-is, requiring the effort of rewriting them for a different department.
Another typical example is sharing information with headquarters only after a problem has already occurred on the ground. If signs that might violate the discontinuation criteria appear, and the Thailand site attempts to resolve the issue internally before reporting it, headquarters will begin the conversation with the question "why wasn't this reported sooner," placing an additional burden of accountability on the Thailand side separate from the actual approval decision.
To avoid this failure, a practical approach is to fix, at the stage of narrowing down the priority of issues, the timing for obtaining at least minimal approval before starting the PoC, and to refrain from starting any work other than data collection before the pre-approval date set in the approval schedule.
Misalignment Between Field Expectations and Head Office Investment Criteria
The sense of improvement shown by the field and the financial criteria headquarters uses for investment decisions may look at the same numbers but evaluate them along different axes. Business units tend to describe results in qualitative terms, such as "fewer inspection reworks" or "reduced burden on staff," but headquarters decision-makers base investment decisions on financial metrics such as NPV (Net Present Value), Payback period, and ROI (Return on Investment). If this misalignment is left unaddressed, even a PoC (Proof of Concept) result that the field considers a sufficient achievement may be put on hold by headquarters on the grounds that "there isn't enough material to support an investment decision."
This misalignment tends to arise when the PoC evaluation criteria are designed solely around KPI improvement rates or processing time reduction, leaving the calculation of return on investment for later. The financial metrics fixed during the selection of indicators to show return on investment (AI ROI) need to be measured in parallel with field KPIs starting from the PoC evaluation stage. Presenting projected values for the financial metrics at the interim report stage avoids the effort of recalculating the figures from scratch at the production deployment decision stage.
Another cause is the discrepancy between the scope of rollout the field expects and the scope headquarters envisions as the investment target. Even if the field proposes improvement premised on a single process, headquarters makes its judgment based on the economic effect assuming rollout across multiple sites, so it is necessary to present figures that include the benefits at scale.
Frequently Asked Questions

We organize the decision criteria around three points: the timing of headquarters approval, how to proceed if approval is not obtained, and whether budget execution is permissible.
Q1: At What Stage Should Head Office Approval Be Obtained?
This is the stage where minimal approval must be secured before starting the PoC (Proof of Concept). Prior approval from the responsible manager must be obtained before data collection or preparation of the verification environment. After this approval, there will be two further approval milestones: an interim report during the PoC and a Go/No-Go decision upon completion. If the initial prior approval is skipped, even favorable verification results will be treated as "an initiative that proceeded without authorization," requiring the approval process to be redone. By using the pre-launch approval as the starting point and working backward to schedule subsequent milestones, it becomes easier to avoid delays caused by waiting for approval.
Q2: What Should Be Done If Approval Is Not Granted?
Rather than assuming full-scale deployment, the approach shifts to a limited verification confined to agreed low-risk conditions. For example, replacing personal data with synthetic data, or narrowing the target business process to a single step. A realistic approach is to redesign the evaluation criteria in line with headquarters' feedback and resubmit. Proceeding to a scope equivalent to full-scale deployment without approval should be avoided.
Q3: Can the PoC Budget Be Used Without Head Office Approval?
Because this must follow the organization's accounting and procurement rules, there is no uniform answer that the local site alone can determine. Even a small-scale internal verification is treated differently depending on the source of the budget.
- If it is fully covered within the Thailand site's discretionary budget and does not involve personal data, internal regulations may allow it to proceed with approval at the site level.
- If funds are allocated from the headquarters budget, or if new tool purchases or outsourcing to external parties are involved, it must go through headquarters' procurement and IT investment approval line, regardless of the amount.
- Verification involving personal data may be subject to review by the compliance department regardless of budget size.
Before starting, check your company's procurement regulations and the table of approval authority, and determine the branching based on the monetary threshold and whether target data is involved. If the criteria are unclear, proceeding on the assumption that prior approval must be obtained before starting the PoC avoids the risk of having the budget execution later deemed invalid.
Summary

The path to advancing AI adoption while obtaining headquarters approval begins with confirming the preconditions. After clarifying where decision-making authority lies and preparing materials on issues and cost-effectiveness, the next step is to identify on-site challenges, prioritize them, and narrow down PoC candidates.
The narrowed-down candidates should be compiled into a proposal document that includes ROI metrics and risk assessments. At the stage of designing the approval process, the approval flows of the Thailand site and headquarters should be aligned, and the approval and schedule should be finalized. After the PoC is conducted, an interim report should be given based on the agreed evaluation criteria, and the decision to move to full-scale deployment should be made once all four conditions are met: KPI achievement, risk mitigation, funding secured, and governance approval.
Both the delay in explaining to headquarters and the mismatch in investment criteria between the field and headquarters stem from insufficient agreement before the project starts. Completing the timing of prior approval and the sharing of financial indicators before the PoC begins is the way to avoid these two pitfalls.
Start by creating a table listing the decision-making authorities and approval stages for your company's Thailand site project.
References
- www.digital.gov.au/policy/ai/AI-POC-to-scale/appendix-1-readiness-checklistAccessed November 27, 2026
- pdpa.dmh.go.th/news/files/pdpa.pdfAccessed November 27, 2026
- tpqi-net.tpqi.go.th/wellcome/unit-info/33792Accessed November 27, 2026
- hatarakikatakaikaku.mhlw.go.jp/casestudy/file203Accessed November 27, 2026
Author & Supervisor
Yusuke Ishihara
Started programming at age 13 with MSX. After graduating from Musashi University, worked on large-scale system development including airline core systems and Japan's first Windows server hosting/VPS infrastructure. Co-founded Site Engine Inc. in 2008. Founded Unimon Inc. in 2010 and Enison Inc. in 2025, leading development of business systems, NLP, and platform solutions. Currently focuses on product development and AI/DX initiatives leveraging generative AI and large language models (LLMs).